Ashtab, M and Ryoo, B Y (2022) Predicting Construction Workforce Demand Using a Combination of Feature Selection and Multivariate Deep-Learning Seq2seq Models. Journal of Construction Engineering and Management, 148(12).

Damdelen, O and Tansu, A (2022) Influence of Recycled Plastic on the Thermal Transmittance and Sustainable Assessment of Concrete Mixes. Journal of Construction Engineering and Management, 148(12).

Kazar, G, Doğan, N B, Ayhan, B U and Tokdemir, O B (2022) Quality Failures–Based Critical Cost Impact Factors: Logistic Regression Analysis. Journal of Construction Engineering and Management, 148(12).

Khurana, M, Garvin, M J and Mahalingam, A (2022) Synthesis of Relational Practices for PPP Contracts and Their Linkage with Governance Mechanisms. Journal of Construction Engineering and Management, 148(12).

Li, S and Xu, Z (2022) System Configuration Design of BIM Object-Oriented Database for Civil Engineering. Journal of Construction Engineering and Management, 148(12).

Lin, S and Cheung, S O (2022) Exploring the Concept of Psychological Distance and Its Impact on Intention to Settle in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 148(12).

Naumets, S, Lu, M and Ali, M (2022) Project Schedule Development under Environment-Induced Time-Window Constraints: Case of Constructing River-Crossing Bridge in Remote Northern Region. Journal of Construction Engineering and Management, 148(12).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002401
  • Abstract:
    A review of literature and practice indicates that there has been a lack of academic research and that there is a shortage of appropriate methods for construction planning and project scheduling for development of projects in northern and remote regions. This study proposes a new project planning method that features seamless integration of specific time-window constraints due to seasonal cycles and environmental regulations. In contrast with the established critical path method, with the proposed method there is no need to estimate each activity’s duration up front as schedule inputs. Instead, a project plan is devised analytically, satisfying all time-window constraints imposed by the environment and precedence relationships defined by construction method. The resulting allowable duration of each activity is further confirmed through activity-level planning. A case study was conducted to schedule the construction of a river-crossing bridge situated at a remote location in the northern region of Canada. Two construction methods (namely crane erection versus incremental launching) were contrasted in two application scenarios. A third application scenario investigated the effect of adjusting the time-window constraint for berm installation activities in implementing the incremental launching method.

Pirzadeh, P, Lingard, H and Zhang, R P (2022) Job Quality and Construction Workers’ Mental Health: Life Course Perspective. Journal of Construction Engineering and Management, 148(12).

Salazar, L A, Ballard, G, Arroyo, P and Alarcón, L F (2022) Development of a Commitment Management System for Construction Projects. Journal of Construction Engineering and Management, 148(12).

Shafique, F and Mollaoglu, S (2022) Shared Transformational Leadership for Green Architecture Engineering and Construction Project Teams: A Study of LEED Projects. Journal of Construction Engineering and Management, 148(12).

Shen, Y, Lin, Z and Wang, Z (2022) Single-Side Accumulative Jacking Construction Method for Large-Span Arched Latticed Shells. Journal of Construction Engineering and Management, 148(12).

Tommelein, I D (2022) Work Density Method for Takt Planning of Construction Processes with Nonrepetitive Work. Journal of Construction Engineering and Management, 148(12).

Wang, J, Han, J, Chen, J, Ding, G, Feng, G, Liu, T and Guo, B (2022) Experimental and Numerical Study on the Dynamic Response of a Superthick Backfill Subgrade under High-Speed Railway Loading: A Case Study of Qianjiang–Zhangjiajie–Changde Railway. Journal of Construction Engineering and Management, 148(12).

Zou, Y, Wu, Y, Guo, B H W, Papadonikolaki, E, Dimyadi, J and Hung, S N (2022) Investigating the New Zealand Off-Site Manufacturing Industry’s Readiness for Automated Compliance Checking. Journal of Construction Engineering and Management, 148(12).